Backward scheduling


Planning for Execution

PAC is responsible for planning and preparing order’ s release to the shop floor. The order should be reviewed to be sure that the necessary tooling, material and capacity are available. Tooling is not generally considered in MRP program, so at this
stage, material availability must be checked. Checking capacity availability is a twostep process. First, the order must be scheduled to see when the capacity is needed, and second, the load on work centers must be checked in that period.

Production Scheduling

Scheduling is an important tool for manufacturing and engineering, where it can have a major impact on the productivity of a process. In manufacturing, the purpose of scheduling is to minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce costs.

Sponsered Links

X
Loading