Log-in / Register

Call +1 205 419 5131

You are hereCapacity Required

Capacity Required


Capacity Required (LOAD)

Simply identifying capacity is only half of the problem.  Manufacturers also have to consider the load going through each of the work centers in the manufacturing process.  This is where the MRP system helps.  The MRP system defines how many jobs have to move through each work center.  If the amount of time required for each job is identified through the use of standards (a standard is an estimate of the period of time it should take to perform an operation), then a capacity analysis can be performed to compare the amount of work each work center can perform to the amoun

Sponsered Links

X
Loading